Half framing, half storage.

The existing framing came first — the parts that were done wrong came out and went back correct, and the rest was laid out for the whole room. New ceiling furring, wiring run, then the drywall went on.

Plaster, sand, paint. The light positions were set before anything got closed up. The stair was its own track: new treads, clear coat, railing added after.

The slat panels on both sides are doors. The columns stayed — boxed in, with the bar built off one of them.