Whole-Home Renovation for Homeowners and Investors in Greater Boston

Renovated kitchen with white painted cabinets, an island and hardwood floor running into the hallway
Whole-home renovation · Greater Boston

Several rooms.
One crew.
One schedule.

Kitchens, bathrooms, floors and paint — scoped room by room in writing, then built by one team that keeps every room on the same plan.

This photo

Hopkinton2023Cabinets refinished · new backsplash
Sun Shore Construction on Houzz
Licensed & insuredProof on request
English & Chinese spoken中文 · English
FOTILE authorizedDealer & installer
4.9 on Google49 reviews
Before & after

Same house.
Different rooms.

Real projects from our own photo files — not stock images. Drag the handle to compare.

The same bathroom after: floating vanity, glass-block window, marble-look tile Bathroom before renovation: tub with brass-framed doors, pedestal sink and dated tile BeforeAfter
Newton20252 bathrooms + new laundry room

Rebuilt on a new floor plan

Same bathroom — compare the vanity wall, the glass-block window and the sliding glass door. Walls opened, reframed to the new layout, insulated, re-plumbed, then tiled and finished.

Old shower with blue mosaic floor before renovation
Before
Renovated bathroom with freestanding tub, subway-tile walk-in shower and sliding glass door
After
Dedham20242 bathrooms + hallway

Walls moved, bath rebuilt

The old shower came out, the wall between the hallway and bedroom was moved, and the bath was rebuilt with a walk-in shower and freestanding tub.

How a whole-home project runs

Six steps, in order.
Nothing skipped.

The middle steps happen inside your walls, where you won't see them once we close up. So here they are.

1

Walkthrough & scope

We walk every room with you, measure, and talk through what stays, what goes, and what each space needs to do for your family.

You'll leave the walkthrough knowing which rooms belong in one project — and which can wait.
2

Written estimate, room by room

You get a written scope that lists the work in each room. Add a room, drop one, or change the order before anything is signed.

Materials are separate: pick your own, or we help you buy them and hand over every receipt.
3

Schedule & permits

We set the order of work so rooms that share walls, pipes or floors are handled together. When the work needs a building permit, we file it. Licensed tradespeople we partner with handle the plumbing and electrical work and permits where your contract includes them.

You know ahead of time which kitchen or bathroom is out of use, and when.
4

Demolition & rough work

Floors and stairs get covered and work areas sealed off. Then walls open up: new framing, insulation, supply lines and drains. If we find something behind the wall, we show you and decide together before it changes anything.

Inside the wall · Newton 2025
Open walls during rough-in: framing, PEX supply lines and PVC drain pipes
Newton2025Rough-in
5

Waterproofing, then finishes

Every shower gets a full waterproofing layer — walls, niche and bench — before a single tile goes up. Then tile, flooring, cabinets, fixtures and paint.

Before tile · Dedham 2024
Shower walls, niche and bench coated in red waterproofing membrane before tiling
Dedham2024Waterproofing
6

Final walkthrough

We walk the house with you room by room, work through the punch list, and leave it clean.

Finished walk-in shower with white subway tile, niche, bench and sliding glass door
Dedham2024Finished
What's included

Every room, one contract.

Pick the rooms you need. We plan them together so the flooring runs through, the paint matches, and nobody waits on another crew.

Kitchen with refinished white cabinets and hardwood floor

Kitchens

Cabinet refinishing or new cabinets, backsplash, sinks and faucets, FOTILE range hoods vented outside.

Bathroom with freestanding tub under a double window

Bathrooms

Tub-to-shower conversions, walk-in showers, tile, vanities, glass doors.

Bedroom with new prefinished hardwood floor

Flooring

Hardwood and tile, with subfloor repair.

Room painted a deep charcoal with hardwood floor

Walls & paint

Drywall repair, patching, primer and finish coats.

New laundry room with washer and dryer and a countertop above

Basements & laundry

New laundry rooms, finished basement space.

Lighting, switches, plumbing

Handled by licensed partner trades — scheduled and coordinated by us, so you don't manage separate contractors.

One team, one schedule

One point of contact for every room, from the first walkthrough to the last punch-list item.

Walk through it

A quick look inside.

15-second project clip — Hopkinton whole-home renovation
13-second project clip — Wellesley bathrooms
Google reviews

In their words.

4.9
★★★★★49 Google reviews
★★★★★
Eric and his team did an amazing job in my house renovating three bathrooms and fixing a multitude of issues around the house. … They left my house clean, spotless, and in time for the Holiday season.
Google review2023
★★★★★
Eric texted with updates throughout the project. They laid down drop cloths, sealed off the work area, and cleaned up every single day. The tile work is flawless, grout lines are perfect, and every fixture was installed with precision.
Google review2025
★★★★★
Eric was the best contractor we have ever worked with. He under promised and over delivered. … Communication was excellent.
Google review2026
★★★★★
Scope of project: Bathroom renovation, kitchen backsplash install, balcony tile install. … Before starting construction, Eric meticulously laid out protection for the floor and matted the work area to ensure that the floor remained clean.
Google review2021
★★★★★
Great communication throughout the project, top-notch quality work from start to finish. Will definitely use Sun Shore Construction again.
Google review2025
Questions

Before you call.

Still unsure? Call (857) 858-2600 — English or Chinese.

Can you renovate several rooms at the same time?

Yes — that's what this service is for. We plan the order so rooms that share walls, plumbing or flooring are done together, and we tell you ahead of time which rooms will be out of use and when.

How does the estimate work?

We visit first and walk every room with you. Then we send a written estimate that lists the work in each room, so you can add, remove or reorder rooms before you sign. Materials are handled separately: choose your own, or we help you buy them and give you the receipts.

Who does the electrical and plumbing?

Licensed partner trades. We schedule and coordinate them as part of your project, so you deal with one team instead of hiring separate contractors.

Do you handle permits?

When the work needs a building permit, we file it. Licensed tradespeople we partner with handle the plumbing and electrical work and permits where your contract includes them.

Can we live in the house during the work?

That depends on which rooms are being worked on, and we plan it with you at the walkthrough. Floors and stairs are covered, work areas are sealed off, and we clean up at the end of each day.

Is the work covered after it's finished?

Yes. Warranty terms, including the labor warranty period, are written into your contract.

Start with a walkthrough

Tell us which rooms you're thinking about.

Send the form or call. We'll set up a walkthrough, then follow with a written, room-by-room estimate.


Sun Shore Construction · Greater BostonLicensed & insured — proof on request(857) 858-2600


Home Remodeling Services Boston

Transform Your Home with Our Remodeling Services
Our professional home remodeling solutions are designed to meet your unique needs and preferences, ensuring high-quality results.

Service Area

Home Remodeling Services
Language »
(857) 858-2600 Call Now Free Estimate